HEALTHCARE

Children’s Hospital Colorado North Expansion

ABOUT In response to the growing healthcare needs of families in Northern Colorado and Southern Wyoming, Children’s Hospital Colorado implemented a 210,000 SF greenfield expansion of their existing 47,000 SF multi-specialty clinic, urgent care, and surgery center in Broomfield, CO, transforming the facility into a pediatric hospital with more than 120,000 SF dedicated to outpatient […]

Children’s Hospital Colorado North Expansion Read More »

Pikes Peak State College–Delta Dental Oral Health Career Center

ABOUT Partially funded through a grant from the Delta Dental of Colorado Foundation, the $6.3 million Pikes Peak State College Delta Dental Oral Health Career Center ushers in a new era of dental education in Colorado to combat the shortage of dental assistants and dental hygienists in the area.   GH Phipps renovated a 12,300-square-foot

Pikes Peak State College–Delta Dental Oral Health Career Center Read More »

Southeast Colorado Hospital District

Located in Springfield, CO, the Southeast Colorado Hospital District has played a critical role in providing comprehensive healthcare to residents throughout rural Baca County since 1969. To provide safer, more comfortable and convenient accommodations to the people of southeastern Colorado, the hospital contracted with GH Phipps to add an Emergency Department area and renovate the

Southeast Colorado Hospital District Read More »

Orthopedic and Spine Center of the Rockies–Ambulatory Surgery Center

The new 67,000 SF facility has six state-of-the-art operating rooms, two shelled operating rooms, a laboratory, a sterile processing department, 20 pre-op rooms, PACU bays, ten recovery rooms, and twelve post-operation overnight recovery rooms to accommodate patients who can’t be sent directly home after surgery. In addition, the facility contains 12,000 SF of OCR business

Orthopedic and Spine Center of the Rockies–Ambulatory Surgery Center Read More »

Trinidad Area Health Association–Mt. San Rafael Additions and Renovations

The complex construction of this project included pre-building demolition/disconnect, a make-safe phase, a new addition, and multiple renovations. The initial demolition of an existing and unoccupied patient care wing led to the construction of a new two-story addition. The new construction included an emergency department, imaging department, CUP, and 14-bed patient care unit. In addition,

Trinidad Area Health Association–Mt. San Rafael Additions and Renovations Read More »

Development Solutions Group–Lincoln Medical Center 

This 120,000-square-foot Medical Office Building included a 2-story buildingon an 11-acre jobsite. Multiple tenant spaces were built out and includeda surgical center with 6 operating rooms, an imaging center with MRI, CTand X-ray. Tenants consist of 2 orthopedic groups, hand surgery, urology,endoscopy, physical therapy tenant, a pediatric tenant, two eye care tenants,and a Lasik tenant.

Development Solutions Group–Lincoln Medical Center  Read More »

Development Solutions Group–The Center at Foresight

The 54-room inpatient skilled nursing facility was a design-build collaboration between Boulder Associates Architects and GH Phipps Construction Companies. A two-story glass main entry includes a reception desk and a large sitting area with a fireplace that welcomes patients and their families to the facility. The first floor consists of administrative offices, a full-service kitchen

Development Solutions Group–The Center at Foresight Read More »

Scroll to Top