K-12 EDUCATION

Jeffco Public Schools–Lakewood High School Addition and Renovation

The Lakewood High School project consisted of a multi-phase remodel and several large additions to the operating school. The 166,000 square feet of new construction included three two-story wings of classrooms, a common area with a cafeteria, a library, and an auxiliary gym. The remodels covered the locker rooms and art spaces. Once the new […]

Jeffco Public Schools–Lakewood High School Addition and Renovation Read More »

Academy District 20–Village High School Adaptive Reuse

Academy School District 20’s Village High school combined online learning with in-person instruction. This teaching style has become so popular that their enrollment has doubled, requiring more space. ASD20 purchased an old building that was being used as a church, to renovate and repurpose into a school building capable of serving 400 students. This design-build

Academy District 20–Village High School Adaptive Reuse Read More »

Weld RE-4 School District–Windsor High School Renovations and New Innovation Center

The Innovation Center was a 2-story addition with Art/Graphics and Fabrication Labs. Demolition of a 28,500 SF building was part of this project. The existing building was in the footprint of the new building and had 10 phases, including 2 summer crunch phases required. Site work included new track surfacing, ADA bleacher upgrades, added parking

Weld RE-4 School District–Windsor High School Renovations and New Innovation Center Read More »

Aurora Public Schools–Vista Peak High School, Preparatory 9-12, Phase 2

Phase 2 of this project included a new classroom wing added to the existing high school. The wing includes 35 classrooms, and administration area and toilet rooms. STEM classrooms were also part of the construction. RTA and MOA were a joint venture on this project. 2 other additions to the existing school included the common

Aurora Public Schools–Vista Peak High School, Preparatory 9-12, Phase 2 Read More »

District 49–Bennett Ranch Elementary School Addition

The Bennett Ranch Elementary School Expansion, designed byCRP Architects, brings 54,000-square-feet of much-needed learning space to District 49. With stunning views of Pikes Peak, the school focuses onmodern technology and innovative lesson design in the classrooms. Completed in May 2023, the school welcomed students for the 2023/2024 school year. The expansion included general classrooms, a

District 49–Bennett Ranch Elementary School Addition Read More »

Littleton Public Schools–Little Raven Elementary

This new elementary school combines East Elementary and Moody Elementary schools. The new building is on the existing Moody site. The 94,000-square-foot building has 25 classrooms, an art room, library, stage, music room, breakout rooms, and a gymnasium with a climbing wall.  The project includes new playgrounds, playing fields, and parking to serve the neighborhood.

Littleton Public Schools–Little Raven Elementary Read More »

Scroll to Top