The GH Phipps Concrete Division completed the $2.4 million concrete contract for the 5-story, interactive art gallery/museum in Denver. Working as a subcontractor to the GC, the GH Phipps concrete team has poured 5,200 cubic yards of concrete for the 80 caissons, foundation and slab-on-metal structure.
- Location: Denver, CO
- Client: Turner Construction
- Size: 78,000 SF
- Cost: $2.5 million
- Architect: Shears Adkins Rockmore (SA+R) Architects