Case Study: Centurylink Network Reliability Center

Challenge:  Centurylink selected GH Phipps to repurpose a 700,000 thousand square foot industrial facility into a critical utility network reliability center which would be responsible for a 14 state reason. This project was considered an “ultra fast track” because of the quick turnaround time.


Solution: Harnessing the power of Lean Construction, the GH Phipps team made the decision to forego the shop drawing submittal and review process, and imply filled out the cut sheets for each frame ourselves and place bi-weekly orders on a full semi load basis.