CONCRETE STRUCTURES

Ball Aerospace & Technologies–Fisher Complex Expansion

The project included a 4-story penthouse remodel and addition with precast concrete. The facility required static dissipation and a 10,000-square-foot clean room for satellite testing. Two high bay clean rooms and one airlock loading room were constructed. The project included two chiller units and building inertia bays for testing satellites with special “shaker” equipment. Precast

Ball Aerospace & Technologies–Fisher Complex Expansion Read More »

Denver International Airport–Concourse A West Expansion

The Concourse A West expansion projects will provide an additional 12 gates (17 bridges, 5 swing gates) with 5 International Nodes. Concourse A West increases the airport footprint by 130,000 sf. Included in the concourse expansion, A West will include an additional 14 new hold rooms for passengers and 10,000 sf of additional concession space.

Denver International Airport–Concourse A West Expansion Read More »

Denver Museum of Nature and Science–Avenir Collections Facility

The Avenir Collections Center is a state-of-the art collections facility that houses the Museum’s 4.3 million specimens and artifacts. On February 14, 2014, the Denver Museum of Nature & Science opened an award-winning five-level addition on its south side. This civic and educational project is a 120,000-square-foot, five-level addition to the museum that is aiming for LEED Platinum certification. The addition will serve a

Denver Museum of Nature and Science–Avenir Collections Facility Read More »

The Weitz Company–One Belleview Station

LEED–Gold Class A Energy Efficient One Belleview Station will be part of a 42-acre, master-planned Belleview Station transit-oriented development near the Belleview light rail station in the Denver Tech Center. It offers companies a sizeable block of space in an energy-efficient building enhanced by numerous amenities. Three cores each 240 feet tall More than 2,600

The Weitz Company–One Belleview Station Read More »

Meow Wolf Denver–Convergence Station

The GH Phipps Concrete Division completed the $2.4 million concrete contract for the 5-story, interactive art gallery/museum in Denver. Working as a subcontractor to the GC, the GH Phipps concrete team has poured 5,200 cubic yards of concrete for the 80 caissons, foundation and slab-on-metal structure. Location: Denver, CO Client: Turner Construction Size: 78,000 SF

Meow Wolf Denver–Convergence Station Read More »

Denver Botanic Gardens–York St. Parking Garage

The Visitors Parking Garage at Denver Botanic Gardens includes shoring on three sides, two levels of parking below grade, and roof deck parking. The garage has access on both the east and west sides of the structure. The garage provides 320 parking spaces, two restrooms, and an elevator. The top deck contains the Welcome Pavilion

Denver Botanic Gardens–York St. Parking Garage Read More »

Prime West–1600 Layton, Belleview Station “Block E”

GH Phipps Concrete partnered with Prime West Companies, Gensler and the Wietz Company to build at Belleview Station Development. Belleview Station Development was a Core and Shell Level II Office building with ground level retail, 5 levels of elevated parking garage, 1 level of underground parking, ground level retail space, and a 15-story office complex.

Prime West–1600 Layton, Belleview Station “Block E” Read More »

Scroll to Top